Case Studies
Canadian Pacific Railway
With volumes of both inbound and outbound containers soon to surpass a facility’s capacity, the terminal design group of Canadian Pacific Railway required an Intermodal Facility Simulation to help determine an economical solution. One option would be for...
read moreAGS Automotive Systems
As one of the leading suppliers of vehicle impact systems for North America, AGS Automotive Systems has six plants throughout Canada and the United States.The Stoney Creek facility assembles the GMT-900 model front bumper for the Chevrolet Silverado Light...
read moreCadbury Adams
Analyze New Plant Layout to Ensure Sufficient Capacity. Cadbury Adams wanted to analyze the revised process-flow layout and its effect on current production volumes within the space limitations of the plant. In response to the planned production volumes,...
read moreGeneral Motors
GM required a Supplier Park Simulation to support the implementation of a planned new process at their Oshawa Car Assembly Plant (OCAP). GM required a Supplier Park Simulation to support the implementation of a planned new process at their Oshawa Car...
read moreNorthrop Grumman
Visual8 was brought onsite to assess the existing manufacturing process and to develop a suitable APS system in response to Northrop Grumman’s needs. The result of this work was the SmartFlow tool – a live, intelligent planning and scheduling system with...
read more