November 2014
Canton, Ohio


TimkenSteel has awarded Visual8 a contract to develop a sequencing optimization tool to improve the flow of steel billets through their conditioning process.

The proposed solution is designed to integrate with existing plant data systems and optimize the loading sequence of billets into plants’ conditioning areas in order to maximize overall throughput and eliminate delays.

The anticipated benefits of the system include: increased throughput, improved line balance, higher due date conformance and reduced manual planning effort. Detailed variance and KPI reporting will provide useful insight into the process and help to close gaps between expected and actual performance.

For more than 10 years, Visual8 has been assisting Timken though the development and implementation of sophisticated planning systems designed to maximize production throughput, increase efficiency and improve order due date conformance. These include a variety of product sequencers, order management systems and predictive monitoring tools.

Learn more about Visual8 optimization solutions!