- OPG Materials Handling ProjectOntario Power Generation wished to perform strategic assessments of the material handling system at its Lambton plant.
- ConocoPhillips Refinery Tank SimulatorConocoPhillips wanted a tool which would help them verify capacity constraints and crude throughput, as well as experiment with different delivery schedules.
- CEMEX Power Distribution SimulatorCemex wanted a tool which would allow them the ability to examine efficiency within their power distribution channels using historical information, real-time data and forecasted demands.
- Xstrata Capital Planning ProjectXstrata’s engineering team looked to Visual8 to build a simulation tool that would help them clearly understand the impact of proposed changes to the workings of the mine.

