- AGS Process Flow ProjectAs one of the leading suppliers of vehicle impact systems for North America, AGS planned to install a new advanced conveyor system. Although, before the system went on-line its capacity and production rate had to be validated.
- PACCAR Inc Capacity Planning ProjectPACCAR Inc designs and manufactures a variety of trucks under the Kenworth, Peterbilt and DAF brand names. One of the key paint shops was operating at a slower rate than the rest of the plant. PACCAR wanted to solve this by synchronizing the operation with the rest of the mail assembly line.
- AGS Production Line Design ProjectThe impending introduction of new vehicle models on new platforms, required AGS to handle an increasing number of component types and styles. The resulting increase in overall process complexity and higher demand volumes required an expansion of plant capacity.
- Linamar Capacity Planning ProjectLinamar needed help evaluating the capability of different line configurations and task divisions to satisfy broadcast requirements. VISAUL8 created a simulation which modelled all assembly work cells and station operations.

