Client Project Case Studies

  • Moen Plating Line Optimization
    Project Case Study: Moen Plating Line Optimization Visual8 Deploys Custom Integrated Optimization Solution for Moen® Plating Line, Increasing Schedule Attainment by Over 30%
  • Candy Production Plant Capacity
    Candy Production Plant Capacity
    Visual8 was approached by Cadbury Adams to discuss their need for a simulation model that would support the reorganization of the company’s Hamilton, ON plant layout and process flow.
  • Warehouse Pick Cell Simulator
    Warehouse Pick Cell Simulator
    Visual8 was approached by the Kroger Company to develop a Pick Cell/Remote DC Simulator that would simulate store- and aisle-friendly product deliveries, with a labor-neutral impact on the overall supply chain system.
  • Supply Network Simulation
    Supply Network Simulation
    LCBO approached Visual8 to develop a SIMUL8 model of the entire LCBO supply-network that would provide a fast and user-friendly simulation tool that would generate graphical and informative reports.
  • Body Shop Bottleneck Analysis
    Body Shop Bottleneck Analysis
    To address the issues and complexities of evaluating bottlenecks within the plant, Ford Motor Company approached Visual8 to develop a V8-Bottleneck decision support tool for its Bodyshop in the Wixom Plant.
  • Remanufacturing Process Redesign Simulation
    Remanufacturing Process Redesign Simulation
    Caterpillar approached Visual8 to support their Prentice Restructure project team in the use of SIMUL8 for the design and development of its new remanufacturing facility.